Sg. Besi – Ulu Kelang Elevated Expressway (SUKE)

Client : Projek Lintasan Kota Holdings Sdn Bhd (PROLINTAS) | Project Scope : Environmental Impact Assessment
Project Completion :  2025

Environmental Impact Assessment (EIA) for The Proposed of Sg. Besi – Ulu Kelang Elevated Expressway (SUKE)

The 31.8 km SUKE Expressway by Prolintas was initiated to ease traffic congestion along MRR2 and improve the connec- tivity throughout the Klang Valley. As the appointed consultant, UKM Pakarunding carried out a comprehensive Environmen- tal Impact Assessment (EIA) to ensure the project aligns with na- tional environmental standards and regulatory requirements.

The assessment covered key aspects including air and water qual- ity, noise and vibration, biodiversity, and community well-being. Through detailed analysis and mitigation planning, the EIA support- ed the project’s commitment to sustainability—paving the way for smoother travel, economic growth, and improved infrastructure with minimal environmental disruption.

Modern infrastructure must go beyond engi- neering — integrating environmental safeguards is key to building resilient, future-ready transport networks

Explore More