NO |
CLIENT |
PROJECT DESCRIPTION |
1 |
Malaysian Palm Oil Board (MPOB) | Climate Projection Downscaling Study of selected Palm Oil Plantations in Peninsular Malaysia |
2 |
ASAP Mobility Sdn Bhd. | Preparing Noise Exposure Assessment (NEA) for Petaling Jaya Dispersal (PJD) Link Alignment, Petaling Jaya, Selangor. |
3 |
OMK Jurutera Perunding Sdn. Bhd. | The Legal and Institutional Framework for The Implementation of Sungai Skudai Integrated river Basin Management (IRBM) |
4 |
Agensi Pengurusan Bencana Negara (NADMA) | Kajian Daftar Risiko Bencana Kebangsaan “National Risk Register (NRR)”. |
5 |
G & P Water & Maritime Sdn. Bhd. | The Legal and Institutional Framework Analysis for The Implementation of The Integrated River Basin Management (IRBM) Plans for Pontian Besar River in Johor. |
6 |
G & P Water & Maritime Sdn. Bhd. | The Legal and Institutional Framework Analysis for The Implementation of The Integrated River Basin Management (IRBM) Plans for Besut Rivers in Terengganu. |
7 |
G & P Water & Maritime Sdn. Bhd. | The Legal and Institutional Framework Analysis for The Implementation of The Integrated River Basin Management (IRBM) Plans for Marang Rivers in Terengganu. |
8 |
ZHL Engineers Sdn. Bhd. | The Legal and Institutional Framework Analysis for The Implementation of The Integrated River Basin Management (IRBM) Plans for Sg Johor & Sg Batu Pahat, Johor. |
9 |
Lynas Malaysia Sdn. Bhd. | Investigation of Thorium Leaching Behavior for WLP and NUF Residue Through Column Percolation Test |
10 |
Dr Nik & Associates Sdn. Bhd. | Penyediaan Pelan Pengurusan Lembangan Sungai Bersepadu (IRBM) Sungai Pulai, Johor. (Assessment Specialist / Socio-Economist) |
11 |
Kementerian Pertahanan Malaysia (MinDef) | Cadangan Penyediaan Kertas Putih Pertahanan |
12 |
CIDB e-Construct Services Sdn. Bhd. | Kajian dan Penyediaan Laporan Penilaian Projek Perintis bagi Projek Pembangunan National BIM e-Submussion System (NBeS) |
13 |
Institut Sosial Malaysia (ISM) | Kajian Diagnostik bagi Membentuk Model Penjagaan Warga Emas Jangka Masa Panjang yang Bersepadu dan Mampan di Malaysia |
14 |
Kementerian Perdagangan Antarabangsa dan Industri (MITI) | Kajian Mengenai Perindustrian RMKE-11 Charting Malaysia’s Strategic Direction for APEC 2020 and Beyond |
15 |
Bahagian Perancang Ekonomi Negeri Johor (BPENJ) | Kajian Pelan Tindakan Ekonomi Kreatif Negeri Johor |
16 |
Agensi Nuklear Malaysia (NM) | Projek Sistem Penggulug Radiografi Industri Pintar untuk Meningkatkan Keselamatan Sinaran dan Produktiviti Pemeriksaan |
17 |
National Institute of Occupational Safety and Health (NIOSH) | Kajian Kompetensi Pekerja Terhadap Mesin Berat (Heavy Machinery) |
18 |
National Institute of Occupational Safety and Health (NIOSH) | Kajian Kelestarian Kompetensi oleh Doktor Kesihatan Pekerjaan di Malaysia |
19 |
Lembaga Perumahan dan Hartanah Selangor (LPHS) | Kajian Model Jaringan Hijau untuk Kawasan Perumahan Kos Rendah Zon 1 Negeri Selangor |
20 |
Lembaga Zakat Selangor (LZS-MAIS) | Kajian Penentuan Pencapaian Status Muallaf (Mukallaf) Negeri Selangor |
21 |
Badan Kawal Selia Air (BKSA) Melaka | Kajian Penetapan Parameter Had Pelepasan Bahan Cemar (Negeri Melaka) |
22 |
Behn Meyer Agricare (M) Sdn. Bhd. | Chemical Health Risk Assessment for Behn Meyer Agricare (M) Sdn. Bhd. |
23 |
Lembaga Urus Air Selangor (LUAS) | Kajian Perbandingan Pelaksanaan Pembinaan Kolam Takungan Hiliran Sumber Air Bestari Jaya berupaya Membekalkan Sumber Air sehingga 3000 JLH (HORAS 3000) |
24 |
Lembaga Zakat Selangor (LZS-MAIS) | Perkhidmatan Pelaksanaan Kajian Penetapan Kadar Had Al-Kifayah Negeri Selangor 2019 |
25 |
Tenaga Nasional Berhad. | Heritage Impact Assessment (HIA) for The Proposed Nenggiri Hydroelectric Project, Gua Musang, Kelantan. |

PROJECT
LIST 2019
